Rosemont Copper Project Design Storm and Precipitation Data/Design Criteria

Document ID: 012066
2009

This memo was developed to solidify various design criteria for use at the Rosemont Copper Project site by various consulting groups. The goal of this analysis was to review info generated from various weather stations and select appropriate precipitation and pan evaporation data applicable to project site.

Carrasco, J. 2009. Rosemont Copper Project Design Storm and Precipitation Data/Design Criteria. Document No. 057/09-320807-5.3. Prepared for Rosemont Copper Company. Tucson, Arizona: Tetra Tech. April 7.