Rainfall Run-off Volumes - Rosemont Heap Leach Facility

Document ID: 012407
2009

This memo provides the potential volume of stormwater run-off that will be captured by the Heap Leachi Pad and associated ponds as per the feasibility design configuration (including Phase 1 and 2 pads).