Baseline Regulatory (100-Yr) Hydrology and Average-Annual Runoff, Rosemont Copper Project

Document ID: 012418
2010

This tech memo provides a summary of Tetra Tech's findings related to predicted baseline regulatory (100-year) hydrology and average-annual runoffi at the proposed Rosemont Copper Project.