Technical Review of Infiltration, Seepage, Fate and Transport Modeling Report - Revision 1 - Part 1 Infiltration and Seepage Model Components

Document ID: 014598
2011

A technical review has been undertaken and this Technical Memorandum prepared at the request of SWCA and the Coronado National Forest, in accordance with a request for a Statement of Work dated December 2, 2010 (Ortman, 2010). Provided here are comments related to the review of Infiltration Seepage, Fate and Transport Modeling Report–Revision 1 prepared for the Rosemont Copper Company by Tetra Tech (2010a) and the Technical Memorandum Rosemont Infiltration, Seepage, Fate and Transport Response to Comments, (Tetra Tech, 2010b).

Sieber, M. 2011. Technical Review of Infiltration, Seepage, Fate and Transport Report—Revision 1, Part 1: Infiltration and Seepage Model Components. Project No. 183101. Prepared for SWCA Environmental Consultants. Tucson, Arizona: SRK Consulting. February 14.