Response to Golder Comments on Drop Chutes - Site Water Management Update Report

Document ID: 015305
2011

 
The application of rock riprap associated with the drop chutes will be re-evaluated in the final design effort and alternate channeli lining, such as articulated concrete blocks, will be investigated.