Davidson Canyon Conceptual Groundwater Monitoring Plan

Document ID: engineering-analytics-2012
2012

The purpose of this Davidson Canyon Conceptual Groundwater Monitoring Plan (Plan) is to recommend additional monitoring locations and data collection that can be used to assist in predicting and evaluating potential future groundwater quantity and quality changes to Davidson Canyon. Potential impacts include water-quality and water-level changes that could alter riparian vegetation and spring flow. This Plan recommends data collection that is intended to confirm and increase the current understanding of the natural hydrogeologic processes that contribute to groundwater and surface water interactions and watershed health.

Engineering Analytics Inc. 2012. Davidson Canyon Conceptual Groundwater Monitoring Plan. Prepared for Rosemont Copper Company. Project No. 110195. Fort Collins, CO: Engineering Analytics Inc. March 30.