Draft EIS References

A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | R | S | T | U | V | W | Y | Z

Zeller, M.E. 2011a. Predicted Regulatory (100-Yr) Hydrology and Average-Annual Runoff Downstream of the Rosemont Copper Project. Tucson, Arizona: Tetra Tech. July 11.

Zeller, M.E. 2010a. Technical Memorandum: Rosemont Baseline and Post-mining Conditions—Alternatives Sedimenti Delivery. Document No. 122/10-320871. Prepared for Rosemont Copper Company. Tucson, AZ: Tetra Tech. April 9.

Zeller, M.E. 2010b. Technical Memorandum: Rosemont Baseline and Post-Mining Conditions—Sedimenti Delivery. Document No. 121/10-320828-5.3. Prepared for Rosemont Copper Company. Tucson, AZ: Tetra Tech. April 9.